FAQs-
With epoxy flooring, homeowners enjoy a cleaner, stronger, and more attractive space that’s built to last and adds real value to their home.
-
We start by preparing the concrete using a professional grinder to ensure proper adhesion. Any cracks or imperfections are filled to create a smooth surface. Next, we apply a strong epoxy base coat, followed by decorative flakes if desired. Once everything has cured, a durable top coat is applied to seal and protect the floor, leaving a clean, long-lasting finish.
-
Before installation, we ask that all items be removed from the service area so our team can properly prepare and coat the concrete. A clear space allows us to work efficiently and deliver the best possible results. If you need help moving items or have any questions before your scheduled service, please contact us ahead of time and we’ll be happy to help.
-
Most epoxy flooring projects are completed in just one day of installation. After installation, the floor needs time to properly cure. We recommend allowing approximately 3–5 days before placing items back on the surface or driving vehicles on it. This curing time ensures the floor reaches maximum strength and durability for long-lasting results.